| Technical connection between buildings on Campus BSN |
|
August 2009 -Education- Technical connection between buildings on Campus BSN In mid-2008 Alewijnse started preparing for a major project dealing with the electrical installations at The British School in The Netherlands (BSN) campus in Leidschenveen (NL). Work is being carried out on campus for the completion of the technical infrastructure between the various buildings, with close cooperation between the involved parties. In this way, a universal system is created which incorporates the fire alarm system, anti-burglary systems, data, telephony and site management systems, among other things.
The new construction involves a school campus consisting of three buildings: - Main building; - Day Care Building (crèche) and - Community Building (sports hall).
The main building will largely be used for educational purposes and general office functions. The building consists of a nucleus of three building layers, with wings either side of each two building layers. The crèche will be split across two floors, with the upper floor being used for offices. The Community Building consists of a sport section with two sports halls, shower and changing facilities, a section with office functions and an education area. The project is due to be completed at the end of 2009.
About the BSN As the centre of a thriving and supportive international expatriate community, made up from over 80 different nationalities, the BSN provides the opportunity of becoming part of a student community defined by an ethos of mutual understanding and cultural harmony. The BSN has high expectations of their students, so whilst appreciating the difference in the ability and achievement of individual children within the classroom, they expect the same high level of behaviour from all. Good behaviour, manners and a respect for teachers and other adults are everyday expectations of their students. (Source: http://www.britishschool.nl/Pages/default.aspx)
De nieuwbouw omvat de bouw van een schoolcampus bestaande uit drie gebouwen: In het hoofdgebouw worden hoofdzakelijk onderwijsfuncties en algemene kantoorfuncties ondergebracht. Het gebouw bestaat uit een kern van drie bouwlagen, met aan weerszijden vleugels van elk twee bouwlagen. Het kinderdagverblijf bestaat uit twee bouwlagen waarbij de onderste bouwlaag deze bestemming krijgt en de bovenste laag een kantoorbestemming heeft. Het Community Building bestaat uit een sportgedeelte met twee gymzalen, was- en kleedruimten en een deel met kantoorfuncties en onderwijsbestemming. De oplevering staat gepland voor eind 2009. About the BSN |


